Commit Graph
7 Commits
Author SHA1 Message Date
Javier Braña 9222eefdf9 feat: Phase 2 - Laravel Reverb + real-time notifications
- Install laravel/reverb + laravel-echo + pusher-js
- Configure broadcasting to reverb in .env.example + .env
- Add Echo + Pusher client in resources/js/app.js
- Update all 14 notifications to implement ShouldBroadcast + broadcastOn()
- Update NotificationBell component to listen for real-time events
- Add Livewire.emit in notification-bell blade for JS-to-Livewire bridge

Tests: 101 passing (319 assertions)
2026-08-31 12:16:56 +02:00
Javier Braña 78d1dbf45a feat: Phase 1 - Redis config, Dashboard cache, Report cache, N+1 fixes, observers
- Add predis/predis for Redis support
- Configure cache/queue defaults to redis in config + .env.example
- Create DashboardController with 60s cache for dashboard queries
- Add cache (5min) to ReportController::generate() and preview()
- Add FeatureObserver, InspectionObserver, IssueObserver for cache invalidation
- Fix N+1 in ProjectMap (eager load template, images), TaskManager (subtasks.parentTask)
- Register observers in AppServiceProvider

Tests: 101 passing (319 assertions)
2026-08-31 09:44:33 +02:00
Javier Braña ee32544525 feat(reports): complete reporting system with deviations, progress curves, multi-format export
- Added planned/actual/baseline dates to Phase and Feature models
- Created ProgressSnapshot model + migration for historical tracking
- Implemented CaptureDailyProgressSnapshot job (scheduled daily at 06:30)
- Added DeviationCalculator logic (SPI, planned progress, deviation days)
- ReportGenerator service with complete data aggregation
- ReportController with builder, preview, generate (HTML/Excel)
- ReportBuilder Livewire component with date range, entity selection, format
- ProjectReportExport with 10 sheets (Summary, Phases, Features, Inspections, Issues, Tasks, Deviations, Media, Progress Curve, Parameters)
- Blade partials for all sections (header, summary, phases, features, inspections, issues, tasks, media, deviations, progress curve)
- New routes: /projects/{project}/reports/*
- Added 'generate reports' permission
- All 101 tests passing
2026-08-24 12:32:08 +02:00
javierandClaude Opus 4.8 17a824f925 feat(api): mobile API Milestone 1+2 — Sanctum auth + offline sync vertical slice
Milestone 1 (auth foundation):
- Installed laravel/sanctum; HasApiTokens on User; published config + migration.
- routes/api.php with /api/v1; Sanctum 'ability' middleware alias registered.
- AuthController: POST login (long-lived revocable device token w/ ability
  mobile-sync + devices table), GET me, POST logout. New Device model/table.

Milestone 2 (vertical slice, offline-first):
- progress_updates: +uuid (client-generated) +client_updated_at.
- ProjectApiController: GET projects (accessibleBy), GET projects/{id}/bundle
  (project/phases/layers/features, membership-authorized).
- SyncController: POST sync — batch ops, idempotent by uuid, per-op result
  (applied/duplicate/error), server-set user_id, authz by permission+membership.
  Currently handles progress_update.create.

Tests: tests/Feature/Api/MobileApiTest (9 passing) — auth, accessible projects,
bundle authz, sync apply+idempotency, permission enforcement.

Also fixed a latent schema bug: projects.reference (and external_reference_1)
existed in the live DB but had no migration — added a guarded migration so fresh
installs match production.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-18 09:05:20 +02:00
javier c556a4910b feat: Add Excel export functionality for reports (projects, phases, inspections) using maatwebsite/excel 2026-05-25 17:21:25 +02:00
javier 4af4387b1e Implement Rappasoft Livewire Tables for project list and replace old component 2026-05-12 14:04:07 +02:00
javier 156aa14bbb Initial commit - construprogress app 2026-05-07 23:31:33 +02:00